The first bed is complete just waiting for top soil, the bed is not a masterpiece but functional. Dug out the 2nd bed need to fashion a wooden raised surround from the old pallets.
Tuesday, 20 April 2010
Had Help
Thursday, 15 April 2010
Re-Think
Right I'm not bothering digging out a soak away too much hassle. I will dig a few drainage channels and just build it up with top soil.
It's surface water not running off, when I stood in the bed I sank up to my shins nearly lost my welly. I think with plenty of soil improvers such has manure & compost it will work out ok.
It's surface water not running off, when I stood in the bed I sank up to my shins nearly lost my welly. I think with plenty of soil improvers such has manure & compost it will work out ok.
Thursday, 8 April 2010
No Good
I had another look at the plot and the one bed so far turned... It's looks like a muddy duck pond. I think I will have to dig about 3-4 foot down and put in a gravel soak away with gravel & sand then fill with top soil.
It is looking more likely that not much will be planted this year :(
It is looking more likely that not much will be planted this year :(
Saturday, 3 April 2010
Pond close up-
Friday, 2 April 2010
New pond :(
First turf turned.
Started to dig over a bed which was pretty tough going. Under the rough grass I have about 3 to 6 inches of soil then it is solid clay. I have double dug the first bed to try and break it up and with there still being abit of frost around it might break up some more.
Subscribe to:
Posts (Atom)
